Project Pipeline
Updated
What Is the Project Pipeline?
The Project Pipeline view answers a critical planning question: of all the projects that were supposed to complete in a given period, what actually happened to them? Were they completed on time? Did new projects get added? Were others pushed into a future period or pulled in early?
This view uses two complementary charts β a waterfall bar chart and a Sankey flow diagram β to give you a clear picture of project throughput, pipeline momentum, and delivery predictability over any selected time window.
How to Access It
Navigate to Insights β Capacity & Planning β Project Pipeline.
What You'll See
Waterfall Bar Chart
The top chart shows the flow of planned versus actual completion for the selected period, broken down into pipeline stages:
Opening β Projects that were active (in progress) at the start of the period
Created β New projects created and started during the period (shown in green, positive)
Pulled In β Projects originally planned for a later period but completed early
Completed β Projects that reached completion during the period (shown in red/negative, as they exit the active pipeline)
Archived β Projects archived during the period
Pushed Out β Projects that were planned to complete but got moved to a future period
Ending β Projects still active at the end of the period
Hover over any bar to see an exact count tooltip (e.g., "Created: 16").
The chart includes refresh and download icons in the top right to refresh data or export the chart.
Project Count vs. Total Project Value Toggle
Use the Project Count / Total Project Value dropdown at the top right of the chart to switch the metric being displayed:
Project Count β Shows pipeline movement in terms of number of projects
Total Project Value β Shows pipeline movement in terms of total contract value (useful for revenue-weighted analysis)
Sankey Flow Diagram
Below the waterfall chart is a Sankey diagram that visually maps the flow of projects from their opening state to their ending state. Color-coded bands show how projects moved through the period β which ones completed, which ones ended the period still in progress, and which were pushed out. The right side of the diagram labels each destination (e.g., "Completed: 8", "Ending: 5").
Summary Bar
The bottom bar shows a quick breakdown: Opening Β· Created Β· Pulled In Β· Completed Β· Archived Β· Pushed Out Β· Ending, with signed numbers (e.g., +16 for created, -6 for completed).
Filters & Controls
Date Range β Define the period to analyze. Defaults to Last 90 days.
All Accounts / All Owners β Narrow the pipeline view to specific accounts or owners.
Statuses β Filter by project status.
Data Field β Add optional custom fields.
Group By β Group results by owner, status, or custom data fields.
Apply β Apply all selected filters.
Tips for Getting the Most Out of This View
A large Pushed Out bar is a leading indicator of delivery risk β investigate which accounts are slipping and why.
Compare Created vs. Completed over time to assess whether your team is keeping up with demand or falling behind.
Switch to Total Project Value to understand the revenue impact of pipeline slippage β not just the volume.
Use Group By β Owner to see which team members have the most pipeline activity and whether throughput is evenly distributed.